2017 Project Planning - 6 month update
Share
What do you mean that there are only two weeks left 'til Canada Day. Shit, the year is almost half over and I've got work to do!
In January I presented my overly optimistic list of 2017 ‘to-dos’ so as we approach the half-way mark, and in the spirit of transparency, I thought that I'd check in on the some of my projects progress and provide a quick update.
Layout
I guess that in all the ‘fun’ stuff I should also include the track and scenery to-dos. After laying the mainline and key switches with tortoise switch machines, I have been troubleshooting my track work and have found a couple of places that need a little TLC. I will continue to sand, fill, gap and redo until the mainline track is flawless.
The Paper Mill. I plan to attack the complex track work in the paper mill section next on the theory that once done, I can have some fun switching if I want a distraction. There is no shortage of track to lay and it would be nice to have it all finished by the time the year comes to a close.
Scenery. I’m not one for the step-by-step approach to model railroading. I know that some people attack all of the benchwork, then all of the track and wiring before moving on to scenery. Call it hobby ADD but I get bored easily and like to mix things up a bit. Two areas of the layout are ‘done’ and the track in those sections isn’t (yes I know) going to change. I’d like to start building the farm scene in some detail and start on the Ciment Quebec scenery.
Auto Rack and Team Tracks. I’m not one for the step-by-step approach to model railroading. I know that some people attack all of the benchwork, then all of the track and wiring before moving on to scenery. Call it hobby ADD but I get bored easily and like to mix things up a bit. Two areas of the layout are ‘done’ and the track in those sections isn’t (yes I know) going to change. I’d like to start building the farm scene in some detail and start on the Ciment Quebec scenery.
Structures. In January I wrote that I had never built a kit and that I wanted to focus on the cement works area. Three buildings have been started - one kit and two scratchbuilds.
DCC
1.Troubleshoot JMRI. No idea why, but when my laptop updated to the most recent MacOS v 10.11.x my JMRI stopped working. Or more specifically JMRI is working fine, but Decoder Pro isn’t programming decoders anymore. No idea why I can no longer read or write to decoders, but my guess is that it has something to do with my Zephyr Xtra DCS 51 not properly communicating with the Digitrax PR3 and I am sure that this little project will occupy many frustrating hours.
2. Set up Command Stations & Boosters. Happily, Steve Juranics gave me a great deal on a used DB 150 Command Station and I plan to hook this up to the DCS 51 – as either the command station or as a booster. The DB 150 has 5 amps of programming power and provides that bit of extra juice to program the troublesome Atlas engines with QSI sound decoders that didn’t seem to want to work with the Zephyr (unless I was programming in blast mode). Part of this project will also involve setting up power districts and hooking up a couple of PM42 Quad Power Managers.
Rolling Stock
I made a promise to myself that I would only run cars on the layout that had at least a minimal level of weathering. I plan to give each car a spray of Dullcote to remove the plastic sheen, a quick dusting of Pan Pastels and a little detail work on the trucks and wheels. In addition, i’ve noticed that most of the couplers need a little bit of attention. I plan to swap out all plastic couplers for Kadees and check their height. At the same time at cars will be weighed and extra weights will be added if necessary.
10. Locomotives. I have a number of locomotive projects planned; from simple weathering and modifications right up to complete strip and repaint jobs. These include:
Structures. In January I wrote that I had never built a kit and that I wanted to focus on the cement works area. Three buildings have been started - one kit and two scratchbuilds.
DCC
1.Troubleshoot JMRI. No idea why, but when my laptop updated to the most recent MacOS v 10.11.x my JMRI stopped working. Or more specifically JMRI is working fine, but Decoder Pro isn’t programming decoders anymore. No idea why I can no longer read or write to decoders, but my guess is that it has something to do with my Zephyr Xtra DCS 51 not properly communicating with the Digitrax PR3 and I am sure that this little project will occupy many frustrating hours.
2. Set up Command Stations & Boosters. Happily, Steve Juranics gave me a great deal on a used DB 150 Command Station and I plan to hook this up to the DCS 51 – as either the command station or as a booster. The DB 150 has 5 amps of programming power and provides that bit of extra juice to program the troublesome Atlas engines with QSI sound decoders that didn’t seem to want to work with the Zephyr (unless I was programming in blast mode). Part of this project will also involve setting up power districts and hooking up a couple of PM42 Quad Power Managers.
Rolling Stock
I made a promise to myself that I would only run cars on the layout that had at least a minimal level of weathering. I plan to give each car a spray of Dullcote to remove the plastic sheen, a quick dusting of Pan Pastels and a little detail work on the trucks and wheels. In addition, i’ve noticed that most of the couplers need a little bit of attention. I plan to swap out all plastic couplers for Kadees and check their height. At the same time at cars will be weighed and extra weights will be added if necessary.
10. Locomotives. I have a number of locomotive projects planned; from simple weathering and modifications right up to complete strip and repaint jobs. These include:
11. Centerbeam Lumber Flatcars. One of my most important goals this year is to have some decent items to bring to the 2017 Toronto Railway Prototype Modelers Meet. Last year I met Chris van der Heide who showed me some of his fantastic lumber loads, and I’ve been busy at work getting this project ready for the next Meet on Saturday, March 18th, 2017.
12. Ecofab gondola covers. The project that I am most proud of and most excited about is my scratch-building of some Ecofab gondola covers out of styrene. This will be the subject of an upcoming blog post, so I’ll leave the details of this project til then.
13. PQTX. I haven’t blogged about this in any great detail other than here, but I have one ‘fun’ and fictional industry on the layout. Poutine Quebec (PQ) will be a poutine factory located outside of Montreal and will have a number of company owned cars. Inbound will be cheese curds in PQTX reefers, potatoes in PQTX boxcars and light brown gravy powder in PQTX hopper cars along with packaging and other assorted supplies. Once a week there would be a PQTX tank car shipment called the ‘gravy train’ that would bring in a heavier grade of gravy for storage in onsite tanks. Outbound would be the finished Poutine Quebec product to market.
Phew. There are more ideas in the works but that is certainly a good start for now. It’s likely that each of these projects will morph into it’s own blog post…so please stay tuned for many more details coming soon.